Project overview

EcoBright Solutions completed a permitted basement improvement project within an existing mixed-use multifamily and commercial building in Center City Philadelphia.

The project required construction around existing electrical and mechanical infrastructure, coordination with other project stakeholders and trades, fire-rated construction requirements, and work performed within the constraints of an existing occupied building.

This was more than a cosmetic renovation. The objective was to complete the required building improvements while protecting existing equipment, coordinating the construction sequence, and satisfying the requirements of the approved permit and inspection process.

Project progression

From early construction to final inspection.

Basement room before construction with peeling multi-colored paint, exposed brick, overhead ductwork and temporary work lights.Before
Existing conditions

The basement space before construction — stripped plaster, exposed masonry, existing ductwork and conduit overhead, and debris across the slab.

Basement corner before construction showing damaged painted walls, insulated ductwork, loose pipe and drywall sheets staged against the wall.Before
Before construction — adjacent bay

Adjacent bay before wall work, with insulated duct runs, black piping and the first drywall sheets staged on site.

Basement equipment room during early construction — taped drywall, overhead ductwork and conduit, existing equipment wrapped in protective plastic.Before
Early construction

Existing basement equipment area with ductwork, conduit and piping in place; equipment sheeted and protected before wall work begins.

Basement room mid-construction with taped drywall walls, scaffold, insulated ductwork and a rated door opening.In progress
Construction in progress

Wall assemblies framed and boarded around equipment that had to remain in place, with protection maintained throughout.

Corridor with fire-rated drywall assemblies taped and compounded, overhead conduit and piping, ladder and materials staged on site.In progress
Fire-rated wall assembly progress

Rated assemblies built out and joints taped and finished, coordinated around existing mechanical and electrical runs.

Completed basement equipment room, painted white walls, clean concrete floor, existing electrical equipment and ductwork in place.Completed
Completed space

Finished, painted equipment room with all existing electrical, HVAC and piping infrastructure retained and integrated.

The situation

The building required improvements to its basement electrical equipment area as part of a larger infrastructure project. Because the space contained substantial existing electrical, HVAC, piping, and other building systems, the construction had to be carefully coordinated around equipment that needed to remain in place.

The challenge

Unlike an empty renovation space, this project required construction around major existing building infrastructure. Electrical equipment, ductwork, piping, conduits, lighting, and other systems had to remain incorporated into the finished space while the required building assemblies were constructed around them.

Scope of work

EcoBright Solutions' construction scope included:

  • Permitted commercial construction
  • Construction and finishing of required wall assemblies
  • Fire-rated construction and related assemblies
  • Installation/coordination of rated door assemblies where required
  • Drywall installation and finishing
  • Painting and finish work
  • Protection of existing building equipment during construction
  • Coordination around existing electrical, HVAC, piping, and mechanical infrastructure
  • Coordination with project stakeholders and specialty trades
  • Permit and inspection coordination
  • Final construction closeout

Electrical work on this project was performed by a separate licensed electrical contractor. EcoBright's role was the construction scope and its coordination.

The outcome

The permitted construction scope was completed and successfully passed final inspection.

The finished space demonstrates EcoBright Solutions' ability to coordinate more complex property-improvement projects involving permits, multiple building systems, specialty trades, and inspection requirements.

For property managers and building owners, some projects require more than individual repairs. They require someone who can understand the overall scope, coordinate the moving pieces, and carry the construction work through completion.

One point of contact. One coordinated scope. One property ready for what comes next.

Call nowFree estimate