Second-Floor Bathroom Renovation: Before & After
A Refreshed Finish Palette, Documented Before and After.
Philadelphia, PA
EcoBright Solutions refreshed a second-floor bathroom, updating the finish palette with new floor tile, paint, and matte-black fixture replacements.
The photos below show only what changed: flooring, wall paint, and fixtures.
Photos from the job.
BeforeThe bathroom's original flooring, paint, and fixtures prior to the update.
CompletedNew floor tile, paint, and matte-black fixtures in place.
The bathroom's existing finishes and fixtures were dated and due for an update.
Coordinating a new finish palette — flooring, paint, and fixtures — into a cohesive, updated look within the existing bathroom layout.
The visible scope of work included:
- New floor tile
- Paint
- Matte-black fixture replacements
The bathroom now shows a refreshed finish palette with new floor tile, paint, and matte-black fixtures.
Documented before-and-after photos of the completed finish work.